Our Installation Process
PROCESS
Building Your Tranquility Pool Fibreglass Swimming Pool
1. Contact Us
Get in touch to arrange a free, no obligation site inspection and written quotation.
2. Choose your pool
Choose from our vast range of shapes and sizes, then choose one of our great colours to turn your pool into a stunning focal point in your back yard.
3. Sign Contract
Facilisi tincidunt egestas morbi a ac massa. Nisl augue enim tortor proin. Sapien pharetra elit vel velit tortor commodo viverra.
4. Plans Prepared
Plans are prepared and the Home Owners Warranty Insurance is ordered as per the Home Building Act 1989.
5. Approval
Application submitted to the Private Certifier after water board approvals.
6. Order and delivery
Upon receipt of the application approval, delivery is advised. The pool manufacture will proceed and the equipment is ordered.
7. Installation
Schedule:
• Day 1 - Excavation of the site;
• Day 2 - Pool installed and equipment fitted.
8. Handover
Pool is cleaned, chemically balanced, advise and instruction is provided on how to operate the pool equipment.
Typical Installation :
Have a tricky installation site?