Skip to content

Our Installation Process

PROCESS

Building Your Tranquility Pool Fibreglass Swimming Pool

1. Contact Us

Get in touch to arrange a free, no obligation site inspection and written quotation.

2. Choose your pool

Choose from our vast range of shapes and sizes, then choose one of our great colours to turn your pool into a stunning focal point in your back yard.

3. Sign Contract

Facilisi tincidunt egestas morbi a ac massa. Nisl augue enim tortor proin. Sapien pharetra elit vel velit tortor commodo viverra.

4. Plans Prepared

Plans are prepared and the Home Owners Warranty Insurance is ordered as per the Home Building Act 1989.

5. Approval

Application submitted to the Private Certifier after water board approvals.

6. Order and delivery

Upon receipt of the application approval, delivery is advised. The pool manufacture will proceed and the equipment is ordered.

7. Installation

Schedule:
• Day 1 - Excavation of the site;
• Day 2 - Pool installed and equipment fitted.

8. Handover

Pool is cleaned, chemically balanced, advise and instruction is provided on how to operate the pool equipment.

Typical Installation :

Excavation
Preparing to lay sand bed
Pool delivered
Est tincidunt scelerisque tortor, nulla sed. Sed facilisis tortor faucibus feugiat ipsum sed justo. Sed ultricies risus vitae lobortis nisi enim purus.
Pool installed and backfilled
Bond beam completed
Coping pavers laid
Landscaping and design
Landscaping and design

Have a tricky installation site?

Tranquility Pools have experience in hard to reach backyards.
At leo volutpat aliquam a. Nulla diam feugiat ipsum sagittis elit quam sodales amet. Enim commodo tincidunt viverra fringilla lectus. Magna.